Health and Safety Priority at Live School Project.

Health and Safety had to be the number one priority for the main contractor and it was an utmost priority that our deliveries and fitting of the flooring and stairs we completed in safe manner. This school development involved working within a live school environment. Our fitters are highly experience and trained to fit stairs and concrete flooring products in such a manner.

New Production Capacity

Our hollowcore floors are slip formed on 1.2m wide production beds. The side of the hollowcore units have a profiled edge. This creates a shear key between individual slabs that allows for distribution of load between slabs when filled on site. Please take a look at our Hollowcore Page for more information on our new hollowcore machine that arrived last year to our plant.

The Multi-million Euro development involves the construction of a new of a new c. 3,300 sq.m. extension to the existing 1000 pupil Secondary School for the Louth and Meath Education and Training Board.

The new extension consists of Engineering and Metalwork room, Special Needs Education rooms, Lecture room, 3 Pastoral Offices, GP Area, 12 general Classrooms, Project Store, Dress Design, 3 Group rooms, 2 Science Rooms, Social Studies room, 3 Maths rooms, 19 toilet areas and Plant, Swich and DC rooms.

Flood Precast have been involved of number new school building project over the last few years click here to look at more.

Contractor: Manley Construction

Architect: McGarry Ni Eanaigh Architects

Engineers: Hayes Higgins Partnership

Products: 1500m2 of Hollowcore and 5 Precast Concrete Stairs

Project: Ratoath College, Co. Meath