LEADING SUPPLIER SINCE 1979
UCD was granted permission for their UCD Student Residences Masterplan, which will be the largest single student housing scheme to date. The ucd student residences masterplan has been developed which proposes to increase existing accommodation from 3,170 to 6,000 bedrooms. This project will deliver a state of the art accommodation, amenity, and retail facilities on UCD’s Belfield Campus.
Flood Precast provided precast stairs and terrace seating to the Auditorium, precast stairs for the Fulcrum and Block D &E, and precast hollowcore and slabs for Block E.
Project: UCD Student Residential Master Plan
Contractor: JJ Rhatigans
Engineer: Barrett Mahoney
Architect: Reddy Architecture + Urbanism
Products: Precast Stairs
Duration of the Overall Project: May 2018 – May 2020, Flood Precast finished on site May 2019
For more information on our range of concrete products contact our team at enquiries@floodprecast.ie
Don’t forget to connect with Flood Precast on LinkedIn