A lazy image

Award Winning Construction Project for Extension to Our Lady’s Children’s Hospital Crumlin.

Flood Precast worked alongside Clancy Construction on the award winning construction project on the Hybrid Cardiac Catheterisation Laboratory and Orthopaedic Theatre Our Lady’s Children Hospital Crumlin. Clancy Construction were awarded Construction Project of the Year at the Irish Construction Industry Awards 2016 and we’re also shortlisted as finalists for the BIM Initiative of the Year […]

A lazy image

Precast Concrete Stairs for Sustainable Homes Efficiency Ratings.

The Flood Precast design team worked together so that the houses will achieve a Code for Sustainable Homes efficiency ratings of Level 3 and Level 4 for the flats. The new homes will also have energy-saving features to keep residents’ running costs and fuel bills down. Sustainability is an increasingly important issue in today’s construction projects. […]

A lazy image

Precast Hollowcore Flooring & Stairs for Teagasc Food Research Centre

Construction of an extension to existing conference facility to contain staff canteen, lecture hall, new entrance, offices, toilets and circulation space. Flood Precast worked on this project and designed supplied and installed Precast Hollowcore flooring and Precast Concrete Stairs. Pre-stressed hollowcore flooring are highly engineered structural products manufactured under factory controlled conditions.  The use of Precast Concrete Hollowcore […]

A lazy image

The Triplets and Flood Precast Concrete Stairs.

King’s Cross Gasholder Triplets are located on a site of three highly decorative, wrought iron Victorian Grade II listed gasometer structures, in the centre of the massive King’s Cross redevelopment project. The Triplets project forms part of the urbanisation of redundant marshalling yards and the subsequent construction of a substantial range of residential, commercial and buildings […]

A lazy image

Precast Stairs and Hollowcore provided for Rapid Build School in Dublin

St Catherine’s NS Rush Rapid Build School project consists of a new 16 classroom school with a SET facility and associated siteworks. The project also includes the demolition of the existing school and removal of the existing prefabricated buildings under a phased programme, along with the provision of temporary accommodation for part duration of the works. […]