Flood Precast provided 22,000 sq m of 100mm prestressed wideslab plate, RC perimeter edge beams and associated stairs and landings.From our proposals it was agreed by main contractor to adapt a design of Flood Precast precast wideslab planks with exposed concrete soffits to utilise the benefits of thermal mass. The building structure consisted of a […]
Latest News
Precast Super Wideslab ® Flooring and Precast Stairs for St. Vincent’s
Flood Precast was appointed to design, manufacture and install precast Super Wideslab® flooring and precast stairs for the four-level extension to the existing multi-storey carpark, located on the north end of the St. Vincent’s University Hospital campus. John Paul Construction are the main contractors at this project. Why use Precast Concrete Wideslab Flooring? A Class […]
Britannia Leisure Centre – Precast Stairs and Super Wideslab®
Main Contractor is Morgan Sindall Construction is on-site delivering two major schemes in the redevelopment of the Britannia Leisure Centre. Flood Precast designed, manufactured and delivery 10000m2 of Precast Concrete Super Wideslab® Flooring and 20no Precast Stairs. Hackney Council is redeveloping the site to deliver a new secondary school, new homes – including genuinely affordable […]
Kangaroo Works and Precast Stairs
Flood Precast we are delighted to be appointed by David Ashley Construction to design, manufacture and supply Precast Concrete Stairs to Kangaroo Works residential development another phase of the Heart in the City II development. 86no precast stairs we’re supplied with yellow tread protection affixed to the each riser. We also worked in conjunction with […]
BIM Technology and Hampton Wood
BIM Technology was a major factor in the design of this stage of Hampton Wood. Flood Precast was delighted to part of the last block of Hampton Wood housing development. The construction of the first of them started in 2004. This phase consists of 5 blocks providing a total of 135 housing units, with blocks […]
Precast Stairs for Heart of the City 2 – Sheffield
Flood Precast worked as a sub-contactor in design and manufacture and delivery of Precast Concrete Stairs for David Ashley Construction to development of Heart of the City 2 by main contactor Galliford Try. As part of this project, we delivered 72no precast stairs and associated precast landings to two Blocks of mixed residential and commercial […]
Precast Stairs for the redevelopment of Southwark Fire Station
Flood Precast worked alongside Addington Formworks in design, manufacturing, and delivery of 86no Precast Stairs and Landings for re-development of the former Southwark Fire Station and Grotto sites. This development will create 199 residential homes, a 900-place secondary school plus a 250-place sixth form, as well as a sports hall and outdoor community green space, […]
Reinforced Wideslab and Stairs provided for the STEAM Dyson Building
The STEAM Dyson Building is a new Centre of Excellence for the study of Physics, Technology, Engineering, Arts and Mathematics at the Gresham School in Holt, Norfolk, UK. Flood Precast designed, manufactured, and supplied 3090m2 of prefabricated reinforced wideslab and east and west stair cores. The aboveground structure of the building consists of a steel […]
Terrace Units and Precast Stairs provided to NUI Maynooth
PROJECT: Maynooth University Academic Building LOCATION: Kilcock Road, Maynooth, Co.Kildare PROJECT SUMMARY: Design, Manufacture and Installation Precast Terrace Units and Precast Concrete Stairs MAIN CONTRACTOR CLIENT: JJ Rhatigan ENGINEER: OCSC ARCHITECT: RKD PRODUCTS: Precast Concrete Stairs and Lecture Theatre Terrace Units For more information on our range of concrete products contact our team at info@floodprecast.co.uk Don’t forget to […]
Precast offsite solution for Harrow Multi-Storey Car Park development
Flood Precast we’re delighted to be appointed as sub-contractor to Kier Construction to provided precast offsite solution of precast concrete slabs and stairs the redevelopment of Harrow Multi-storey car park. The main structure of the building was designed as steel frame, with prestressed slabs at the depth of 75 mm with a layer of 100 […]