Standground Academy, Peterborough

 

Project Details:

Project:Standground Academy, Peterborough
Category:Education
Contractor:Kier
Engineer:PEP consultancy
Units:Prestressed Flood Super Wideslab® flooring units

 

The Stanground Academy opened in the surviving buildings of the former Stanground College. This major capital building programme costing £24m and was completed in September 2013 and now provides state-of-the-art amenities and beautifully designed and finished buildings for students and staff.  These fantastic new buildings provide high quality academic, vocational and sports facilities.

Benefits of using Flood Super Wideslab®

  • Up to 50% faster on-site installation times
  • Wider, longer, shallower, stronger.
  • Verrsatile casting and reinforcement options
  • High-quality soffit finish – optimised thermal mass potential
  • Widely used alternative to Hollowcore

Other Sectors