Main Contractor is Morgan Sindall Construction is on-site delivering two major schemes in the redevelopment of the Britannia Leisure Centre. Flood Precast designed, manufactured and delivery 10000m2 of Precast Concrete Super Wideslab® Flooring and 20no Precast Stairs. Hackney Council is redeveloping the site to deliver a new secondary school, new homes – including genuinely affordable social rent and shared ownership homes – and a new state-of-the-art leisure centre.
The whole developments consist of constructing the new hi-tech Britannia Leisure Centre under a £53.8 million contract and a new secondary school the City of London Academy under a £43.7 million contract.
Designed with local people and users, the new leisure centre will include:
- Six-lane, 25 metre main pool with moveable floor
- 20 metre x 10 metre training pool with moveable floor
- Leisure water – for children and families – with water features and a flume
- Café and toilets
- Six-court sports hall
- Crèche and soft play area
- Sauna and steam room
- Fitness suite, spin studio and flexible studio spaces
- Four squash courts
- Two five-a-side pitches
- Two tennis/netball courts
Main Contractor: Morgan Sindall
Client: Hackney Council
Engineer: Buro Happold
Architect: Feilden Clegg Bradley Studios
Products: 20 No Precast Stairs and Associated Precast Landings and 10000m2 of Super Wideslab®
For more information on our range of concrete products contact our team at info@floodprecast.co.uk
Don’t forget to connect with Flood Precast on LinkedIn