Central and East Quad building

Precast Stairs provided for Central and East Quad building DIT New Campus

Flood Precast staircases conform to all current regulations and can accommodate most architectural layouts. Design and manufacture are carried out in accordance with BS 8110: 1997. These stairs giving a Type ‘B’ finish. Landings can be cast integral with the stair flights or separate in order to achieve the optimum staircase construction.

The Central Quad buildings will accommodate academic activities and facilities required for a total of ten schools from the College of Sciences & Health, College of Engineering & Built Environment and the College of Arts & Tourism. The gross internal floor area for the Central Quad will be approx. 36,000 m2

The East Quad buildings will accommodate the majority of academic activities and facilities required for the College of Creative & Cultural Industries which currently consists of seven schools, five of which will be accommodated within the East Quad. The gross internal floor area for the East Quad will be approx. 16,000 m2.

Expected Opening Date: September 2020

Project: Dublin Institute of Technology – Grangegorman Campus

Contractor: FCC Construcitón/John Sisk and Sons

Engineer:  IDOM Consulting, Engineering

Architect: Feilden Clegg Bradley Studios

Products: 80no Stairs for Central and East Quad building

For more information on our range of concrete products contact our team at enquiries@floodprecast.ie

Don’t forget to connect with Flood Precast on LinkedIn