A lazy image

Flood Super Wideslab® – Benefits for School Building Project.

Flood Precast worked in partnership with JJ Rhatigan’s to design, supply and install our Flood Super Wideslab® and Precast Stairs for this school building project.

Project Information: Scoil Naisiunta Bheinin Naofa Buachalli and Cailini, Duleek, Co.Meath

The proposals include the demolition and removal of the existing girls and boys schools and the construction of a new 4,832m.sq two-storey building at Abbey Road, Balsaran. The new school will comprise of a new girls school and boys school, each consisting of 16 classrooms, a general purpose room, ancillary teaching and staff accommodation and 56 car parking spaces.

Flood Super Wideslab® Benefits for School Building Projects:

  • High Quality Soffit Finish – Saves on costs and time as it can be painted on directly.
  • Thermal Mass Properties – Can save heating costs.
  • Accommodate awkward shapes – Due to production process can be easily moulded within our plant saving time on site.
  • Shallow Floors – Shallow floor construction reduces floor to floor height
  • Composite Action with Steel Frame –  Prestressed precast elements act compositely with an in-situ structural screed combining the benefits of precast and in-situ construction.
  • Strong BREEAM Rating – Saving on Costs and Time within manufacturing and construction.

Project Team:

Contractor:  JJ Rhatigan & Company

Engineer:  Rhatigan Architects

Architect:   RPS

For more information on our range of concrete products contact our team at info@floodprecast.co.uk

Don’t forget to connect with Flood Precast on LinkedIn