Precast Concrete Stair cores provided for world-class Institute of Regeneration and Repair, Edinburgh.

Flood Precast provided precast concrete stair cores and landings for the Institute of Regeneration and Repair, Edinburgh. These precast stairs and landings were designed and manufactured in reinforced concrete to suit the individual requirements of the client. Construction is due to finish on a £50 million research centre focused on how the body repairs its […]

A lazy image

Flood Super Wideslab® Flooring provided for Killarney’s Europe Hotel new €3m staff accommodation block

Flood Precast worked in conjunction with Griffin Brothers Construction, based in Castleisland, Co Kerry, providing 1200m2 of Precast Flood Super Wideslab Flooring for the staff accommodation block at the Europe Hotel which is planned to open in August 2018. Flood Super Wideslab flooring maintains excellent quality and strength characteristics, however, is more convenient to install, […]

A lazy image

Multi-story buildings made with precast concrete elements

Flood Precast worked in conjunction with Flynn & O’Flaherty on providing the precast concrete elements on the new apartment buildings at Phoenix Park Racecourse.  Large amounts of high-quality buildings can be built in a very short space of time with precast concrete flooring and precast stairs. Unlike poured concrete floors, prestressed concrete floor slabs offer […]

A lazy image

Flood Super Wideslab® flooring used to accommodate services requirements at Milford Care Centre.

Flood Precast provided precast hollowcore flooring, precast stairs with areas of Flood Super Wideslab® flooring to accommodate the large amount the M+E requirements. Flood Super Wideslab® flooring units are manufactured in the long line prestressed system minimising costs and production time. Openings for services, pipes and ducting can all be cast into the precast concrete […]

A lazy image

Building the Future at Drumalee GAA with Flood Precast Hollowcore Flooring

Flood Precast provided 200mm of Hollowcore flooring and precast stairs to Tully Developments who we’re the main contractors on the new clubhouse. Flood Precast Hollowcore Flooring units are machine cast concrete slabs, with tubular voids extending the full length of each slab, creating a lightweight building unit, saving money on materials and transport costs.   […]

A lazy image

Hollowcore Precast Concrete Flooring – Reinforced Concrete Floors provided for Faithful Fields

Flood Precast provided 150mm Hollowcore Reinforced Concrete Floors for the first floor at this new GAA complex. The Faithful Fields is a new €1.9 million centre of excellence for Offaly GAA which was completed at end of summer in 2017. The facility includes four sand-based playing pitches, meeting rooms, dressing rooms, running track, floodlighting and […]

A lazy image

Precast Concrete Stairs provided for new welsh speaking primary school

Flood Precast provided Precast Concrete Stairs for this project. Morgan Sindall is the main contractor, this building will provide 2,500 sqm of floor space, in a two storey primary school and nursery building. The £7.8 million school is being built on Lewis Road. Funded by Cardiff Council and the Welsh Government through the city’s £164 […]

A lazy image

New A&E department using Flood Precast Concrete Products.

Flood Precast worked in conjunction with sub-contractor Harrington’s Builders in providing this project with the following flood precast concrete products. 3000sqm of Precast Hollowcore flooring 24no Precast Stairs. This project has been described as “ground-breaking”. This development cost £49 million and is set to revamp and expand Wexham Park Hospital’s Accident and Emergency (A&E) department. Frimley […]

A lazy image

Benefits of Thermal Mass used as part of living laboratory in Newcastle University

As part of the project at Newcastle University Urban Science Building, Where the building really differs from any standard building is the fact that the whole building is a laboratory and has several key features which allow the operation of the building to be analysed by academics with an overall view to improving its performance. One […]